Before the paperwork
Is your business plan ready?
Location, local competition, budget and the size of the site are best weighed up before any application goes in. Our “Starting a car wash” guide takes you through those decisions one by one.

Everything an investor goes through, in order: securing the site, getting planning permission, configuring the wash, then installation and the final sign-off before opening.
A self-service jet wash is not built in one go. The project moves through several stages – finding and securing the land, obtaining planning permission and the other approvals your local council requires, settling the configuration, putting up the canopy and equipment and, finally, having the completed site signed off.
On this page we walk through all six stages in turn: which documents each one calls for, roughly how long approvals and building work take and where projects most often get held up, so you can plan around it.
Before the paperwork
Location, local competition, budget and the size of the site are best weighed up before any application goes in. Our “Starting a car wash” guide takes you through those decisions one by one.
Each stage builds on the one before. Follow them in order and you will get from picking a location to opening a working site without backtracking.
Look for land that is easy to drive into, clearly visible and close to utility connections, and make sure you have the legal right to use it – freehold or a lease, typically of 10 years or more. A conditional contract is the safest option: it only becomes binding once you know the scheme can go ahead. Bringing in a local architect this early pays off, as they know how the council works and can shorten the process considerably.
usually 3–6 months, depending on the council
Working from BKF's technical guidelines – slab and structure drawings plus structural calculations – your architect puts together the architectural and construction design and submits the planning application for you.
1–2 months of groundworks + 2–7 days to install
With approvals in place, work starts on site: the concrete base is laid and power, gas and water supplies are connected, then the canopy and equipment are fitted on the finished slab. A BKF engineer assigned to your project supervises the installation from start to finish.
varies by council – often a few months
Start by finding out whether the Local Plan for the area allows a car wash on your site. Where the policy is unclear, councils usually expect a pre-application enquiry, typically backed by confirmations from utility providers and an outline site layout, which BKF can help you draw up. This is the first formal sign that the scheme is viable – and it goes much more smoothly with an architect who already deals with the local planning team.
Compare car wash manufacturers on their track record, the support they offer and the sites they have already delivered, then settle the specification: how many bays (most sites have 2 to 6), which type of wash, what extra equipment and a look that fits your brand. You can go straight to a full order, or ask for a free, no-commitment design first so you can see the concept before deciding.
set by local rules – typically a few weeks
When the build is finished, you gather the test certificates your council asks for – usually covering the electrical, plumbing and heating work – and notify the bodies named in your approvals. After sign-off the wash can open, and BKF follows up with operator training, chemicals and servicing. Counting from the very first application to the day you open, the whole project typically takes 12 to 18 months, with local procedures making the difference.
Look for land that is easy to drive into, clearly visible and close to utility connections, and make sure you have the legal right to use it – freehold or a lease, typically of 10 years or more. A conditional contract is the safest option: it only becomes binding once you know the scheme can go ahead. Bringing in a local architect this early pays off, as they know how the council works and can shorten the process considerably.
varies by council – often a few months
Start by finding out whether the Local Plan for the area allows a car wash on your site. Where the policy is unclear, councils usually expect a pre-application enquiry, typically backed by confirmations from utility providers and an outline site layout, which BKF can help you draw up. This is the first formal sign that the scheme is viable – and it goes much more smoothly with an architect who already deals with the local planning team.
usually 3–6 months, depending on the council
Working from BKF's technical guidelines – slab and structure drawings plus structural calculations – your architect puts together the architectural and construction design and submits the planning application for you.
Compare car wash manufacturers on their track record, the support they offer and the sites they have already delivered, then settle the specification: how many bays (most sites have 2 to 6), which type of wash, what extra equipment and a look that fits your brand. You can go straight to a full order, or ask for a free, no-commitment design first so you can see the concept before deciding.
1–2 months of groundworks + 2–7 days to install
With approvals in place, work starts on site: the concrete base is laid and power, gas and water supplies are connected, then the canopy and equipment are fitted on the finished slab. A BKF engineer assigned to your project supervises the installation from start to finish.
set by local rules – typically a few weeks
When the build is finished, you gather the test certificates your council asks for – usually covering the electrical, plumbing and heating work – and notify the bodies named in your approvals. After sign-off the wash can open, and BKF follows up with operator training, chemicals and servicing. Counting from the very first application to the day you open, the whole project typically takes 12 to 18 months, with local procedures making the difference.

Everything else in the project rests on the site you pick. Before taking any further steps, check that the land satisfies every formal requirement and that planning rules really permit a car wash there.
In this video we go through checking local planning policy, the situations in which you will need a separate application and how to judge whether a particular plot really suits the project.
The more of these boxes a plot ticks, the stronger its case as the home of a self-service jet wash:
Land next to a business the investor already runs – a shop, forecourt, MOT centre or garage – is a big plus. The two businesses feed each other customers, and the utility connections cost less.
The minimum footprint and plot size for a self-service jet wash depend on how many bays you plan. Allow a further 20 m² for every vacuum point, plus space for access.
| Number of bays | Building footprint | Minimum plot |
|---|---|---|
| 2 bays | 60 m² | 470 m² |
| 3 bays | 90 m² | 560 m² |
| 4 bays | 120 m² | 650 m² |
| 4 bays (containerised) | 135 m² | 695 m² |
| 5 bays | 150 m² | 740 m² |
| 5 bays (containerised) | 165 m² | 785 m² |
| 6 bays | 180 m² | 830 m² |
| 6 bays (containerised) | 195 m² | 875 m² |
Two things come first: confirming that the site can take a car wash, and assembling every document your local council needs to grant planning permission.
You can build a self-service jet wash on land you own or lease. Whichever route you take, make the contract conditional, so that it only comes into force once you know approval for a car wash on that site is achievable.
The decision lies with the local planning authority – in practice the local council. Where the Local Plan already covers the site, it sets the rules. Where it does not, you will normally need to seek the council's view through a pre-application enquiry, which is usually supported by:
The paperwork can be handled in-house or passed to an architect. The second option tends to be quicker, because an architect knows the council's officers and processes. In both cases, agree a contract with a firm timetable.
Target decision times are set nationally, but in practice consultations with other bodies often push them beyond the minimum, so build a few months for this stage into your plan.
When the Local Plan or the council's pre-application response supports a car wash on the site, your architect turns the technical guidelines from BKF – floor plan, drawings of the structure and the structural calculations – into the full planning application pack, which normally contains:
Your architect lodges the application on your behalf. How long the council takes depends on the authority and can stretch if officers raise further questions; any conditions attached to the decision also take time to discharge. From submission to a permission you can build on, expect several months.
Building work and any site preparation can lawfully begin only after this stage is closed.
Your manufacturer does more than deliver kit for the build – it stays with you for years. A good working relationship keeps the project on track and pays off later, when the site needs servicing, extending or upgrading.
Look for a manufacturer with long experience and a portfolio of real sites – the clearest sign of whether it can deliver on your location.
BKF has made touch-free car washes for more than 30 years and has supplied over 1,800 units to 30 markets in Europe and Asia.
The right partner is still there once the site is open, with quick service visits and spare parts readily available.
BKF offers in-warranty and out-of-warranty servicing backed by a 970 m² store of genuine spare parts, so breakdowns are dealt with fast.
Find out whether the manufacturer develops its own technology or simply assembles bought-in parts – it shows in the quality of the wash and in what the site costs to run.
BKF has an in-house R&D department and develops its own touch-free and automatic wash technology, including features that cut water, gas and electricity use.
Besides the wash equipment, a strong manufacturer provides the canopy, the extras and the tools you need to run the business day to day.
BKF also gives you Carwash Manager for running the wash remotely – already used on more than 600 sites – along with tested chemicals matched to your wash technology.
These are the decisions that shape your site: the type of wash, how many bays and programmes, the extras and equipment, and the appearance. Each choice narrows down the next, so take them in this order.
01
Let your business model decide which type of wash you build. Then add the options that lengthen the equipment's working life and make day-to-day operation safer, depending on what matters to you.
Jet wash configurations02
Match bay numbers to the traffic your location can realistically deliver. Add extra programmes too – wheel cleaning, active foam or a turbo brush – because these are what push up the average spend per visit.
Wash programmes03
Pick the additional equipment – vacuums, change machines, a screenwash dispenser. BKF Pay is worth considering as well: mobile payments and a loyalty programme bring customers back more often.
BKF Pay04
Think about brand colours, an eye-catching fascia, lighting and the design of the canopy. First impressions decide whether a driver pulls in or carries on past.
Car wash canopiesWith planning permission granted and a manufacturer chosen, work moves on to the site itself. Here is what the installation involves and which formalities follow once the building work is done.
A building firm will be needed, plus a site manager where local rules call for one – from day one they take responsibility for everything happening on site.
The preparatory works – casting the concrete base and connecting power, gas and water – generally last 1 to 2 months. How much there is to do depends on the utilities already on the site and on ground conditions.
When the slab is ready, the canopy and wash equipment go in, which takes between two days and a week depending on the site type and how many bays there are. A dedicated BKF engineer checks that everything is installed correctly, so you have expert support on hand – even if this is your first car wash.
Your approvals state which bodies must be told once the work is finished. The first job is to collect the test certificates your council requires – usually for the wiring, plumbing and heating.
Depending on local rules, environmental health and fire safety officers may also need to approve the site. The full set of documents then goes to building control, together with confirmation that the site is ready to use.
Response times are laid down nationally and can be anything between a few weeks and longer when extra documents are requested. Leave room in your timetable for gathering the paperwork and answering any follow-up questions.
After sign-off you can lawfully open to the public. BKF trains you to operate the wash and puts together a chemicals and servicing package – and from the very first application to the day you open, the project as a whole typically takes 12 to 18 months, with local procedures making the difference.
Everything begins with the site. It needs enough space, a prominent position – beside a supermarket or petrol station, for example – and utility connections within easy reach. Location has a huge effect on how well the business does: more people living nearby and more passing traffic mean more customers, and easy entry plus a clear view from the road lift takings further. Before you even shortlist sites, try the return on investment calculator and Build your car wash – together they show the likely takings per wash, typical monthly income and the cost of a site with the equipment you pick.
Technology is the other big decision. Generally, the more convenience you give drivers, the more of them come through. When comparing potential partners, look at how well their canopies are built, how many sites they have delivered, the equipment and extras they offer and the software that takes the effort out of running a wash. BKF sites combine advanced wash technology with energy-saving features that help operators run a tighter business. Weigh up the project thoroughly and look into the company you intend to work with – and if anything is unclear, our advisers will gladly help.
Want to open a car wash without expensive mistakes? Taking the build one step at a time is the right approach, as long as you go in well informed.
A self-service jet wash project also comes down to picking the correct technology and programmes. This is where advice from specialists who know the field pays for itself: they can tell you which solutions suit your business and guide you towards effective, professional chemicals. BKF supplies safe, tried-and-tested chemicals and a broad range of professional products for car washes, so every operator can find what fits their site.
What does it take to run a car wash at a profit? Start with a professional manufacturer that supplies not just the right system but also the tools to help you manage the business – working with BKF, you have all of that covered. Here are a few more pointers for looking after your business:
Opening a car wash clearly means meeting a long list of requirements. That is why an experienced manufacturer like BKF makes sense – one partner for professional solutions, from the wash itself through to its installation.